National Parts Depot
Search ...

Repair Harness, Water Temperature Sending Unit, Incl (1) 12 Inch Long Lead W/ Molded Receptacle, Designed To Replace Factory Plug


Full Description
Repair Harness, Water Temperature Sending Unit, Incl (1) 12 Inch Long Lead W/ Molded Receptacle, Designed To Replace Factory Plug
Item # M-10R884-4AA
MPN # M-10R884-4AA

$2.99
In Stock!




In Store Availability:
FL
NC
MI
CA
Description

REPAIR HARNESS, WATER TEMPERATURE SENDING UNIT, INCL (1) 12 INCH LONG LEAD W/ MOLDED RECEPTACLE, DESIGNED TO REPLACE FACTORY PLUG

Ford Mustang Years:

1979, (79), 1980 (80), 1981 (81), 1982 (82), 1983 (83), 1984 (84), 1985 (85), 1986 (86), 1987 (87), 1988 (88), 1989 (89), 1990 (90), 1991 (91), 1992 (92), 1993 (93), 1994 (94), 1995 (95)

Vehicle Information

Year-Range (bold)      Model (bold)      Fits/Applications

1979-1993 MUSTANG

1994-1995 MUSTANG

WARNING: This product can expose you to chemicals including lead and DEHP, which are known to the State of California to cause cancer and birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov.

Reviews

0 Reviews
 
Write a Review