National Parts Depot
Search ...

Repair Harness, Back Up Light Switch, Incl (2) 9 Inch Long Leads, Designed To Work With Most Ford T-5 And M/T


Full Description
Repair Harness, Back Up Light Switch, Incl (2) 9 Inch Long Leads, Designed To Work With Most Ford T-5 And M/T
(1)
Item # M-15R520-1A
MPN # M-15R520-1A
Brand: Ron Francis Wiring

$29.80
In Stock!




In Store Availability:
FL
NC
MI
CA
Description

Ford Mustang Years:

1979, (79), 1980 (80), 1981 (81), 1982 (82), 1983 (83), 1984 (84), 1985 (85), 1986 (86), 1987 (87), 1988 (88), 1989 (89), 1990 (90), 1991 (91), 1992 (92), 1993 (93), 1994 (94), 1995 (95), 1996 (96), 1997 (97), 1998 (98), 1999 (99), 2000 (00), 2001 (01), 2002 (02), 2003 (03), 2004 (04)

Vehicle Information

Year-Range (bold)      Model (bold)      Fits/Applications

1979-1993 MUSTANG

1994-2004 MUSTANG W/ M/T W/O ATTACHED WIRE ON 2001-2004 MODELS

WARNING: This product can expose you to chemicals including lead and DEHP, which are known to the State of California to cause cancer and birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov.

Reviews

5 Star Avg.
1 Review

100% of reviewers recommend this product.

Write a Review
Verified Buyer Repair Harness, Back Up Light Switch, Incl (2) 9 Inch Long Leads, Designed To Work With Most Ford T-5 And M/T

Fits my T5 that I am swapping into a 67 Mustang. After I purchased it I found that you also sell a harness with the correct end for the existing harness that would have saved me a step. This works fine though.

Submitted on June 04, 2020 by

YES I would recommend this product.

Quality

5 Stars

Value

5 Stars